00352 - 27 28 15 38 | mycon@mycon.lu

00352 - 27 28 15 38 | mycon@mycon.lu

Title 1

ASBESTOS DETECTION

Report / Analysis report
1950 € excl. VAT Asbestos report certificate
150 excl. VAT per sample
290 € excl. VAT per sample / 48h certificate

Title 1

LABORATORY ANALYSIS

Report / Analysis report
1950 € excl. VAT Asbestos report certificate
150 excl. VAT per sample
290 € excl. VAT per sample / 48h certificate

Title 1

DEMOLITION WORK

Report / Analysis report
1950 € excl. VAT Asbestos certificate report
150 excl. VAT per sample
290 € excl. VAT per sample / 48h certificate

Title 1

DESAMINATION

Report / Analysis report
1950 € excl. VAT Asbestos certificate report
150 excl. VAT per sample
290 € excl. VAT per sample / 48h certificate

Title 1

RENOVATION

Report / Analysis report
1950 € excl. VAT Asbestos certificate report
150 excl. VAT per sample
290 € excl. VAT per sample / 48h certificate

previous arrow
next arrow

ASBESTOS, A VERY PRACTICAL BUT DANGEROUS MATERIAL

For decades, asbestos, which is hazardous to health, has been used in various compositions as a building material and has now proved to be a huge disposal problem. Although asbestos has not been used and marketed throughout Europe for many years, it can be found in many places, particularly in older buildings, due to its uses in technical applications, its resistance to fire and acid and other excellent material properties.

Asbestos fibres are usually bound in an integrated form. Fibres can be released, for example, during weathering, renovation and demolition work. Even with light renovation work - for example drilling a hole or breaking off asbestos insulation boards - asbestos can be inhaled. The finest asbestos dust represents a high health risk, even in the smallest quantities, so only specialised companies should be used for this work and, at best, the whole building should be cleared of asbestos. This is the only way to exclude future risks to residents and workers.

ASBESTOS REMOVAL

There are not only strict legal provisions for renovation, demolition work and final cleaning of buildings or parts of buildings due to asbestos contamination. Regulations must also be observed when handling asbestos-containing materials following work.

Asbestos waste is packaged in a dust-tight manner and must be disposed of as hazardous waste. All these factors contribute to the sometimes considerable costs of removing asbestos from buildings. As a general rule, renovation work due to asbestos pollution can be claimed for operational properties if the above-mentioned report is available before the renovation begins. 

However, a homeowner should never fear the costs of asbestos removal.

STRICT LEGAL REQUIREMENTS APPLY TO ASBESTOS REMOVAL

The use of asbestos and the use of asbestos products have been strictly prohibited throughout the European Union and in Switzerland for several years due to the clearly established health risks. A few decades ago, however, asbestos was used without hesitation in a wide variety of industries, including the construction sector. Asbestos, which is extremely hazardous to health, is now primarily a huge site of contamination and an expensive disposal problem.

In the course of demolition, renovation and maintenance work on buildings, workers, employees, supervisors and even residents may come into contact with asbestos fibres, which must be avoided at all costs and the relevant legal safety regulations must be observed.

Against floating hazards in buildings:

Even though asbestos products have been banned from manufacture and the market for years, it is not uncommon for certain occupational groups to come into contact with asbestos products. This is particularly true for employees in the plumbing, heating, air conditioning and construction trades, as asbestos was introduced because of its excellent technical properties (heat and acid resistance, high strength, better insulation properties) until the 1970s and 1980s. Spray asbestos, used for insulation and fire protection, is particularly dangerous. Spray asbestos is a weakly bound material and can therefore very easily release carcinogenic asbestos fibres.

There is a real risk if asbestos fibres are released, however :

Homeowners wishing to get rid of the harmful effects of asbestos should be aware of the potential risks involved in renovation. Indeed, even small activities or repairs should not be carried out by yourself. Apart from the fact that this is not allowed either, this is where most of the asbestos contamination occurs. In order to be able to better assess the potential danger and clarify a possible solution, it is imperative to consult experts in the private sector. The first point of contact can be the building and/or environmental authorities of your place of residence. On request, they will appoint interested or assigned certified experts to assess a potential asbestos risk 

In the case of a specific renovation project, a specialised company must be commissioned without exception. All asbestos removal work is subject to legal regulations which must be strictly adhered to by the owners or the company carrying out the asbestos removal.

Failure to comply with safety requirements when disposing of asbestos sources will result in criminal prosecution and extensive liability exclusion under insurance law.

Contact us if you have any questions about asbestos removal.

POLLUTANT REPORTS

It is advisable to have a pollutant report drawn up before starting asbestos removal. The concentrations of asbestos in the ambient air are measured by an expert and the individual components are examined in detail. Based on the results of the report, a special concept for the renovation of a building is developed in order to keep the effort and thus the costs as low as possible. Such pollutant reports are offered, which makes the costs of asbestos removal assessable and offers the client additional legal protection from environmental laboratories.

  • Asbestos or asbestos products in buildings may, for example, have been contained or installed in the following areas:
    • Ventilation, extraction and smoke extraction ducts
    • Fire dampers, firewalls
    • Fire door infills or cladding
    • Pipes, fittings, ventilation and electrical ducts
    • Coatings for electrical installations, electrical cabinets
    • Cable ducts and cable trays
    • Insulation of night storage heaters
    • Coatings and insulation for heating boilers
    • Sealing ropes and flat seals (red seals)
    • Asbestos textile mats, seals and cords
    • Floor insulation
    • Lining and cladding of concrete, steel or wood struts, supports and beams
    • Façade cladding, façade panels and roof coverings
    • Corrugated roof sheets, roofing sheets and roof shingles
    • Roof and wall coverings
    • Lightweight panels and exterior wall cladding

Once all asbestos fibre residues have been completely removed as part of the renovation and subsequent thorough cleaning of the asbestos-removed building, prescribed breathing air monitoring measurements are performed. If the exposure limit values are not reached during the release measurement, the building in question may be reinstated and used normally.

en_GB